{"product_id":"practical-guide-to-the-nec3-professional-services-contract-isbn-9780470672341","title":"Practical Guide to the NEC3 Professional Services Contract","description":"Currently in its third edition, the NEC suite has become one of the UK’s leading families of standard forms of contract for major construction and civil engineering projects. Part of the NEC suite, the Professional Services Contract (PSC) was drafted with the same process-based approach and objectives, offering a standard contract for the appointment of consultants providing professional services in an engineering or construction project. Embodying best practice in terms of project management, the basic philosophy of the PSC differs from the principles and approach of other standard contracts used to appoint consultants.  \u003cp\u003eThis book is a practical guide to the application of the PSC. Starting with a brief discussion of the background and philosophy behind the PSC, it identifies the roles and responsibilities of each of the named functions within the contract, explains the approaches required to achieve a successful working relationship between all parties, and examines all the procedures in the PSC. The book explains the links between the various sections of the contract to assist the reader with cross referencing, and covers all the variations created by the Main and Secondary Options. As a very practical guide it will aid users in the transition from their use and understanding of the other standard contracts to the collaborative project management-based approach of the PSC.\u003c\/p\u003e \u003cp\u003eWritten for anyone working in the construction and related industries using the PSC to procure or provide consultancy services in relation to a construction project, it will be of interest to the complete construction supply chain, particularly architects, structural engineers, services (M\u0026amp;E) engineers, civil engineers, quantity surveyors and interior designers, together with Contractors and Sub-Contractors who have a design liability and employ consultants to assist them. It will also be of interest to consultants and lawyers advising any of these parties, either in the preparation of contract documentation or the resolution of problem situations which may arise.\u003c\/p\u003e  \u003cp\u003e\u003cb\u003e1 Introduction 1\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 1.1 General 1\u003cbr\u003e \u003cbr\u003e 1.2 Mechanics not law 2\u003cbr\u003e \u003cbr\u003e 1.3 A simple formula for understanding a contract 2\u003cbr\u003e \u003cbr\u003e 1.4 Mandatory or discretionary 3\u003cbr\u003e \u003cbr\u003e 1.5 Conditions precedent 4\u003cbr\u003e \u003cbr\u003e 1.6 Note on use of upper case in key words and phrases 4\u003c\/p\u003e \u003cp\u003e\u003cb\u003e2 Background to the NEC Family of Contracts 6\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 2.1 The background: First editions 6\u003cbr\u003e \u003cbr\u003e 2.2 The second edition 7\u003cbr\u003e \u003cbr\u003e 2.3 The third edition 8\u003cbr\u003e \u003cbr\u003e 2.4 Endorsement of NEC3 by the Office of Government Commerce 8\u003cbr\u003e \u003cbr\u003e 2.5 General philosophy: Aims and objectives 9\u003cbr\u003e \u003cbr\u003e 2.6 Flexibility 9\u003cbr\u003e \u003cbr\u003e 2.7 Clarity and simplicity 10\u003cbr\u003e \u003cbr\u003e 2.8 Stimulus to good management 11\u003cbr\u003e \u003cbr\u003e 2.9 Other characteristics 12\u003c\/p\u003e \u003cp\u003e\u003cb\u003e3 The Options: An Overview 13\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 3.1 General arrangement of the PSC 13\u003cbr\u003e \u003cbr\u003e 3.2 Other documents referred to 15\u003cbr\u003e \u003cbr\u003e 3.3 Contract Data 16\u003cbr\u003e \u003cbr\u003e 3.4 The published documents 16\u003cbr\u003e \u003cbr\u003e 3.5 Main options: General outline 17\u003cbr\u003e \u003cbr\u003e \u003cb\u003e4 'Spirit of Mutual Trust and Cooperation' 18\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 4.1 Introduction 18\u003cbr\u003e \u003cbr\u003e 4.2 Core clause 10.1 18\u003cbr\u003e \u003cbr\u003e 4.3 What does it mean? 20\u003cbr\u003e \u003cbr\u003e 4.4 Practical issues 21\u003c\/p\u003e \u003cp\u003e\u003cb\u003e5 The Cast of Characters 25\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 5.1 Introduction 25\u003cbr\u003e \u003cbr\u003e 5.2 The Employer 25\u003cbr\u003e \u003cbr\u003e 5.3 The Employer's Agent 27\u003cbr\u003e \u003cbr\u003e 5.4 The Consultant 29\u003cbr\u003e \u003cbr\u003e 5.5 The Adjudicator 29\u003cbr\u003e \u003cbr\u003e 5.6 Subconsultants 30\u003cbr\u003e \u003cbr\u003e 5.7 'Others' 30\u003cbr\u003e \u003cbr\u003e 5.8 CDM Coordinator 31\u003cbr\u003e \u003cbr\u003e 5.9 Principal Contractor 32\u003cbr\u003e \u003cbr\u003e 5.10 Practical issues 32\u003c\/p\u003e \u003cp\u003e\u003cb\u003e6 Communications, Early Warnings and other General Matters 34\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 6.1 Introduction 34\u003cbr\u003e \u003cbr\u003e 6.2 Communications: The clause 34\u003cbr\u003e \u003cbr\u003e 6.3 Communications: Practical issues 36\u003cbr\u003e \u003cbr\u003e 6.4 Early warnings: The clause 38\u003cbr\u003e \u003cbr\u003e 6.5 Early warnings: Practical issues 39\u003cbr\u003e \u003cbr\u003e 6.6 Other matters: The clauses 42\u003cbr\u003e \u003cbr\u003e 6.7 Other matters: Practical issues 44\u003c\/p\u003e \u003cp\u003e\u003cb\u003e7 The Parties' Main Responsibilities 46\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 7.1 Introduction 46\u003cbr\u003e \u003cbr\u003e 7.2 The Employer's obligations 46\u003cbr\u003e \u003cbr\u003e 7.3 The Consultant's obligations 47\u003cbr\u003e \u003cbr\u003e 7.4 Other matters 48\u003cbr\u003e \u003cbr\u003e 7.5 Practical issues 52\u003c\/p\u003e \u003cp\u003e\u003cb\u003e8 Subconsulting 55\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 8.1 Introduction 55\u003cbr\u003e \u003cbr\u003e 8.2 Definition of a Subconsultant 55\u003cbr\u003e \u003cbr\u003e 8.3 The core clauses 56\u003cbr\u003e \u003cbr\u003e 8.4 Provisions in the main options 56\u003cbr\u003e \u003cbr\u003e 8.5 Practical issues 57\u003cbr\u003e \u003cbr\u003e 8.6 Using the PSC as a Subcontract 58\u003c\/p\u003e \u003cp\u003e\u003cb\u003e9 Quality 59\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 9.1 Introduction 59\u003cbr\u003e \u003cbr\u003e 9.2 Quality management system 59\u003cbr\u003e \u003cbr\u003e 9.3 What is a Defect? 60\u003cbr\u003e \u003cbr\u003e 9.4 The Defects procedure 61\u003cbr\u003e \u003cbr\u003e 9.5 Uncorrected Defects 62\u003cbr\u003e \u003cbr\u003e 9.6 Practical issues 62\u003c\/p\u003e \u003cp\u003e\u003cb\u003e10 Rights to Material 65\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 10.1 Introduction 65\u003cbr\u003e \u003cbr\u003e 10.2 The core clauses 65\u003cbr\u003e \u003cbr\u003e 10.3 Secondary option X9 66\u003cbr\u003e \u003cbr\u003e 10.4 Practical issues 67\u003c\/p\u003e \u003cp\u003e\u003cb\u003e11 Indemnity, Insurance and Liability 68\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 11.1 Introduction 68\u003cbr\u003e \u003cbr\u003e 11.2 The core clauses 68\u003cbr\u003e \u003cbr\u003e 11.3 Secondary option X18: Limitation of liability 70\u003cbr\u003e \u003cbr\u003e 11.4 Practical issues 71\u003c\/p\u003e \u003cp\u003e\u003cb\u003e12 Time 74\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 12.1 Introduction 74\u003cbr\u003e \u003cbr\u003e 12.2 The programme: Contents 75\u003cbr\u003e \u003cbr\u003e 12.3 The programme: Submitting, accepting and revising 79\u003cbr\u003e \u003cbr\u003e 12.4 The programme: Practical issues 82\u003cbr\u003e \u003cbr\u003e 12.5 Starting and finishing 90\u003cbr\u003e \u003cbr\u003e 12.6 Other matters 93\u003cbr\u003e \u003cbr\u003e 12.7 Secondary options related to Time 95\u003cbr\u003e \u003cbr\u003e 12.8 Practical issues 97\u003c\/p\u003e \u003cp\u003e\u003cb\u003e13 Payment 100\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 13.1 Introduction 100\u003cbr\u003e \u003cbr\u003e 13.2 The payment process 100\u003cbr\u003e \u003cbr\u003e 13.3 Payments in multiple currencies 102\u003cbr\u003e \u003cbr\u003e 13.4 The amount due and the Price for Services Provided to Date 103\u003cbr\u003e \u003cbr\u003e 13.5 Supporting documents and records 107\u003cbr\u003e \u003cbr\u003e 13.6 The Consultant's share 111\u003cbr\u003e \u003cbr\u003e 13.7 The Consultant's share: Practical issues 112\u003cbr\u003e \u003cbr\u003e 13.8 Special provisions for the UK 114\u003cbr\u003e \u003cbr\u003e 13.9 Related secondary options 116\u003cbr\u003e \u003cbr\u003e 13.10 Practical issues 118\u003c\/p\u003e \u003cp\u003e\u003cb\u003e14 Compensation Events: Theory and Events 120\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 14.1 Introduction 120\u003cbr\u003e \u003cbr\u003e 14.2 The theory 120\u003cbr\u003e \u003cbr\u003e 14.3 The events 122\u003cbr\u003e \u003cbr\u003e 14.4 Practical issues 130\u003c\/p\u003e \u003cp\u003e\u003cb\u003e15 Compensation Events: Procedures 132\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 15.1 Introduction 132\u003cbr\u003e \u003cbr\u003e 15.2 Notification by the Employer 133\u003cbr\u003e \u003cbr\u003e 15.3 Notification by the Consultant and the Employer's reply 136\u003cbr\u003e \u003cbr\u003e 15.4 Other matters associated with notifying compensation events 139\u003cbr\u003e \u003cbr\u003e 15.5 Quotations: Substance 141\u003cbr\u003e \u003cbr\u003e 15.6 Quotations: Submission and reply 142\u003cbr\u003e \u003cbr\u003e 15.7 Assessments by the Employer 147\u003cbr\u003e \u003cbr\u003e 15.8 Implementing compensation events 148\u003cbr\u003e \u003cbr\u003e 15.9 Practical issues 149\u003c\/p\u003e \u003cp\u003e\u003cb\u003e16 Compensation Events: Assessment 154\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 16.1 Introduction 154\u003cbr\u003e \u003cbr\u003e 16.2 Changes to the Prices 155\u003cbr\u003e \u003cbr\u003e 16.3 Changes to the Completion Date and any Key Dates 159\u003cbr\u003e \u003cbr\u003e 16.4 Employer’s assumptions 162\u003cbr\u003e \u003cbr\u003e 16.5 Other related matters 163\u003cbr\u003e \u003cbr\u003e 16.6 Practical issues 165\u003c\/p\u003e \u003cp\u003e\u003cb\u003e17 Termination 168\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 17.1 Introduction 168\u003cbr\u003e \u003cbr\u003e 17.2 Reasons for termination 168\u003cbr\u003e \u003cbr\u003e 17.3 Secondary option X11: Termination by the Employer 171\u003cbr\u003e \u003cbr\u003e 17.4 Implementing termination 171\u003cbr\u003e \u003cbr\u003e 17.5 Procedures after termination 172\u003cbr\u003e \u003cbr\u003e 17.6 Payment on termination 173\u003cbr\u003e \u003cbr\u003e 17.7 Practical issues 174\u003c\/p\u003e \u003cp\u003e\u003cb\u003e18 Dispute Resolution 176\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 18.1 Introduction 176\u003cbr\u003e \u003cbr\u003e 18.2 Option W1 177\u003cbr\u003e \u003cbr\u003e 18.3 Option W2 180\u003cbr\u003e \u003cbr\u003e 18.4 Practical issues 185\u003c\/p\u003e \u003cp\u003e\u003cb\u003e19 Secondary Options 188\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 19.1 Introduction 188\u003cbr\u003e \u003cbr\u003e 19.2 X2: Changes in the law 188\u003cbr\u003e \u003cbr\u003e 19.3 X4: Parent company guarantee 189\u003cbr\u003e \u003cbr\u003e 19.4 X8: Collateral warranty agreements 189\u003cbr\u003e \u003cbr\u003e 19.5 X12: Partnering 190\u003cbr\u003e \u003cbr\u003e 19.6 X13: Performance bond 194\u003cbr\u003e \u003cbr\u003e 19.7 X20: Key Performance Indicators 195\u003cbr\u003e \u003cbr\u003e 19.8 Y(UK)3: The Contracts (Rights of Third Parties) Act 1999 196\u003cbr\u003e \u003cbr\u003e 19.9 Z: Additional conditions of contract 196\u003cbr\u003e \u003cbr\u003e 19.10 Practical issues 197\u003c\/p\u003e \u003cp\u003e\u003cb\u003e20 Completing the Contract Data 199\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 20.1 Introduction 199\u003cbr\u003e \u003cbr\u003e 20.2 Purpose and form of the Contract Data 199\u003cbr\u003e \u003cbr\u003e 20.3 Part One: Data for the core clauses 200\u003cbr\u003e \u003cbr\u003e 20.4 Part One: Data for the main option clauses 204\u003cbr\u003e \u003cbr\u003e 20.5 Part One: Data for the secondary option clauses 205\u003cbr\u003e \u003cbr\u003e 20.6 Part Two: Data for the core clauses 209\u003cbr\u003e \u003cbr\u003e 20.7 Part Two: Data for the optional statements 209\u003cbr\u003e \u003cbr\u003e 20.8 Practical issues 211\u003c\/p\u003e \u003cp\u003e\u003cb\u003e21 The Supporting Documents: Need and Content 214\u003c\/b\u003e\u003cbr\u003e \u003cbr\u003e 21.1 Introduction 214\u003cbr\u003e \u003cbr\u003e 21.2 Scope 214\u003cbr\u003e \u003cbr\u003e 21.3 Practical issues 221\u003cbr\u003e \u003cbr\u003e Bibliography 224\u003cbr\u003e \u003cbr\u003e Further Reading 225\u003cbr\u003e \u003cbr\u003e Appendix 1 Tables of Clause Numbers, Case Law and Statutes 226\u003cbr\u003e \u003cbr\u003e Appendix 2 Tables of Employer’s, Consultant’s and Adjudicator's Actions 233\u003c\/p\u003e  \u003cb\u003eMichael Rowlinson\u003c\/b\u003e MSc, DipArb, MRICS, FCIOB, FCIArb, FCICES, is a Director of Alway Associates (London) Ltd. He is an experienced construction professional, having qualified initially as a Chartered Quantity Surveyor and later as a Chartered Builder. After over 20 years with private practice and contractors Michael joined Alway Associates in 1998, specialising in Construction Contracts and Law. As part of his work Michael has lectured extensively for the Construction Study Centre and direct for his own clients, predominantly on the NEC suite of Contracts. He has written a number of articles on this suite of contracts which have been published in the Civil Engineering Surveyor and the NEC User Group’s Newsletter, as well as on the Alway Associates website. This is his second book about a contract from the NEC3 suite.  Currently in its third edition, the NEC suite has become one of the UK’s leading families of standard forms of contract for major construction and civil engineering projects. Part of the NEC suite, the Professional Services Contract (PSC) was drafted with the same process-based approach and objectives, offering a standard contract for the appointment of consultants providing professional services in an engineering or construction project. Embodying best practice in terms of project management, the basic philosophy of the PSC differs from the principles and approach of other standard contracts used to appoint consultants.  \u003cp\u003eThis book is a practical guide to the application of the PSC. Starting with a brief discussion of the background and philosophy behind the PSC, it identifies the roles and responsibilities of each of the named functions within the contract, explains the approaches required to achieve a successful working relationship between all parties, and examines all the procedures in the PSC. The book explains the links between the various sections of the contract to assist the reader with cross referencing, and covers all the variations created by the Main and Secondary Options. As a very practical guide it will aid users in the transition from their use and understanding of the other standard contracts to the collaborative project management-based approach of the PSC.\u003c\/p\u003e \u003cp\u003eWritten for anyone working in the construction and related industries using the PSC to procure or provide consultancy services in relation to a construction project, it will be of interest to the complete construction supply chain, particularly architects, structural engineers, services (M\u0026amp;E) engineers, civil engineers, quantity surveyors and interior designers, together with Contractors and Sub-Contractors who have a design liability and employ consultants to assist them. It will also be of interest to consultants and lawyers advising any of these parties, either in the preparation of contract documentation or the resolution of problem situations which may arise.\u003c\/p\u003e","brand":"Wiley-Blackwell","offers":[{"title":"Default Title","offer_id":47989832024293,"sku":"NP9780470672341","price":119.95,"currency_code":"USD","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/1842\/7735\/files\/9780470672341.jpg?v=1761785613","url":"https:\/\/k12savings.com\/products\/practical-guide-to-the-nec3-professional-services-contract-isbn-9780470672341","provider":"K12savings","version":"1.0","type":"link"}