Models for Financing, Cost and Risk Assessment of Major Railway Tunnel Projects in Europe

Agotado
Precio original $165.00 - Precio original $165.00
Precio original
$165.00
$165.00 - $165.00
Precio actual $165.00
Description
Project managers of large railroad tunnels in Europe summarize their experiences. In addition to explaining the general conditions, they give an overview of financing, cost and risk management, scheduling, quality control and auditing.
The book address project manager of major infrastructure projects as well as decision makers, financers, engineers. Additionally, it provides valuable information for organizations that are responsible for future projects in politics and management.

In dem Buch fassen Projektverantwortliche ihre Erfahrungen aus großen Eisenbahninfrastrukturprojekten in Europa zusammen. Neben der Erklärung der wichtigsten Rahmenbedingungen für den Bau großer Infrastrukturprojekte geben Sie einen Überblick über die verschiedenen Methoden zur Finanzierung, zum Kosten- und Risikomanagement sowie zur Prüfung und Kontrolle von Tunnelprojekten in verschiedenen Ländern.

Das Buch richtet sich sowohl an Verantwortliche für große Infrastrukturprojekte als auch an Entscheidungsträger, Finanzierungsbeteiligte, Projektingenieure und Projektmanager sowie an Organisationen, die für zukünftige Projekte in Politik und Management verantwortlich sind.

Austria
Germany
Norway
Slovenia
Switzerland
Brenner base tunnel: Transnational project between Austria and Italy
Lyon-Turin: Transnational project between Italy and France
Conclusion - essential elements of cost and risk management The "Long Railway Alpine Tunnel Project Managers" group was founded in 1993 on the initiative of the SBB. Initially, the two project managers from the Mont-Cenis (now Lyon-Turin) and Gotthard Base Tunnels were involved. Later, those responsible for the Semmering, Brenner and Lötschberg Base Tunnel projects and for the Channel Tunnel were included in the group, which is now called "Project Managers Long Tunnels". The group has been meeting about twice a year for over 20 years to exchange information and experiences. The composition of this group and the valuable exchange of experience have led to cost-effective and functional solutions.

Die Gruppe "Projektleiter der langen Eisenbahn-Alpentunne" wurde 1993 auf Initiative der SBB gegründet. Zunächst waren die beiden Projektleiter aus den Basistunneln Mont-Cenis (heute Lyon-Turin) und Gotthard beteiligt. Später wurden die Verantwortlichen für die Basistunnelprojekte Semmering, Brenner und Lötschberg sowie für den Kanaltunnel in die Gruppe aufgenommen, die nun "Projektleiter lange Tunnel" heißt. Die Gruppe trifft sich seit über 20 Jahren ca. zweimal im Jahr zum Informations- und Erfahrungsaustausch. Die Zusammensetzung dieser Gruppe und der wertvolle Erfahrungsaustausch haben zu kostengünstigen und funktionalen Lösungen geführt.


PUBLISHER:

Wiley

ISBN-13:

9783433033159

BINDING:

Paperback

BISAC:

Technology & Engineering

LANGUAGE:

English

Request a Quote

Interested in this product? Get a personalized quote.